Last night was a busy night on the WRS, a total of eight operators were busy working the different jobs on the Railroad. This allowed for a brakeman to be added to each of the crews. This move allowed the required time to do a Turn to be reduced to a point we were able to do three Turns. The extra people did cause a problem when everyone was heading to or from the Yard. This is going to be addressed by moving the yard to increase the wallway between the yard and wall on the Crew side of the Yard. This will likley cause a number of other problems as most of the layout could be moving also. Time will tell.
Also looking to add an industry or two to Junction Turn.
I am hoping to have this work finished before the Monday Night Gang visits again.