Sunday, July 28, 2013

July 28th Update

I was hoping to get an Ops Session in this month, but things came up.  Did make the trip this month to Windsor to ride on the Trecothic Creek & Windsor Railway with my family.  Did make few trips around the railway with my great nephew Colby.

Now back to the WRS, have done a little track work in the South Yard and at the Mill.  The Yard tracks at the Mill were lengthen by roughly a car length.  In the South Yard, two track were lengthen and two were shorten because of the switch movements.

There will be a few changes to paperwork. Train 102 will now be Yard to Yard transfer running earlier in the Schedule. The old Train 102 has been replace with the MEC Transfer, which will depart the South Yard for the Mill and then return from the Mill to the South Yard.  This Train maybe also doing a little switching in the South Yard. Also there will be a small chance to Train 201 in dealing with Dogwood.

Traffic to and from the Mill has be increased.   I am hoping to add about ten more cars.

That is it for now.  I am not sure if the WRS will be operating in August at the present time.

Doug