The picture below is the end of Bartown, which is where the new benchwork will start. Just behind the post is where the present track is.



The last 8 feet will be on the top of the shelf, the white object with all the junk on top of it. This will be 12 to 14 inches wide.

The stage yard will be entering the other room somewhere on the shelf area. Even with adding the shelf where will be between 30 to 36 inch walkway for operators. If I move "the place where projects go to die", I could add another 8 feet to Blue Ridge :-)
1 comment:
Cool! Thanks Doug
Post a Comment