
Wayne, in front, working the Mainline Trains, Glen and Pierre in the background working Dogwood and Roseton.

Dave, in tie, and Wayne are working 203 N at Dogwood, as Glen, Dogwood Operator watches.
Under the new operating session, the Mainline is very busy with six trains. Last night, Wayne ran these trains with the assistance of Dave, later in the session. Because the South Connection has not be completed, it required a few extra movements getting the train from the Yard to South Connection or from South Connection to Yard.
The Mill is serviced by four of these trains plus the In Mill moves, which kept Pierre busy. But he did have time to do a little work in Roseton as well.
Dogwood is service by four of the Mainline Trains, and Rosewood are also serviced by four of the Mainline Trains. Most of the work in these two towns was done by Glen.
I was busy in the Yard staging trains and being Freight Agent.
We had a great time again.
later
Doug