The WRS was on the Road again on the weekend. With five of the old modules and one new one, headed for the Show in Dartmouth. The new module was a run around siding to improve operations. The layout was roughly 35 feet from end to end, with four other operator adding modules.
Below are a few pictures from the Show
Looking down the mainline from the Woodchip loading.
On the left is the new module with David and Wayne on the left and David T on the right working with a young engineer.
David T filling out the UMG Operator Card for a young Engineer
Young Engineer waiting for the mainline to clear so he can continue with the RDC.
Below are a few pictures from the Show
Looking down the mainline from the Woodchip loading.
On the left is the new module with David and Wayne on the left and David T on the right working with a young engineer.
David T filling out the UMG Operator Card for a young Engineer
Young Engineer waiting for the mainline to clear so he can continue with the RDC.
This is the center of the layout, with David T overseeing the young engineer
2 comments:
What no comment on the operating session Sat night. Geezz we must have really messed that one up! HA!
That is the next post
Doug
Post a Comment