The WRS will be operating again on March 24th.
As usual I have a list of things to get done before the next operating session. I have noticed a few spots where we are having power pick up issues. I will have to install a few more feeders.
Also I am going to combine the Roseton Local and the Junction / Blue Ridge Turn into Ridge Run.
later
Doug
Tuesday, March 18, 2008
Subscribe to:
Post Comments (Atom)
2 comments:
Have the power problems been at turnouts? IF so, do you use Atlas or all Peco?
I've been having some trouble lately with my older Atlas turnouts. I have to solder a flexible feeder across the rivet to get power from the lead rail to the point rail.
Scott
Scott
The issue is that I did not put a feed on ten foot section between Riverside and Bartown. Just need to address this with another feed drop.
I use all Peco on my layout at present.
I have a couple of switches to deal with later that I installed insulated rail joiners on them.
later
Doug
Post a Comment