Tuesday, November 24, 2009

Ops Session Nov 23

WRS had another Ops Session on Monday night. I forgot to check if it was a full moon, but many strange things happened. It all started when cars began derailing on one section of the railroad. Then the train will break in half. Requiring the train had to stop and go back to pick them up. The Control System decided to take a break. Yard crew not lining up switches for incoming trains. And there are two pictures at the bottom.



Pierre waiting for someone to come and pick up the cars he had set on the sidings.


Wayne wondering. Dave in the background working Bartown.


Barry busy switching the Mill

This takes special talents to "park" the van halfway up pole.


The Engineer of the Switcher forgot .....
But we had fun, and that is the most important thing.
Doug

2 comments:

Scott Jay said...

I notice you don't include the offenders in the photos. Since when do we protect the guilty!?

Let's see... CSI on the job. We can identify Pierre in the second photo by the sleeve of his shirt. Wayne, also with an identifiable sleeve, is pretty quick to point out the error!

The first one happened at the Mill so can we assume Barry had something to do with it? Or perhaps it was Wayne who was running the freight? Hmmm... Not enough hard evidence from the photos. We need the video from the security cameras at the mill.

HA!

Scott

Wayne Woodland said...

Geezz Scott were you a PI in your previous life?? I wont let the cat out of the bag, but there were some pretty funny moments during the session...hopefully the crew in the caboose werent having their lunch!

Wayne