Friday, Riely and Connor, two members of the Board of Directors, came to operate the WRS. During the four hours of operating, most of the rolling stock on the railroad moved. For more then an hour all that moved on the railroad were flat cars moving heavy construction equipment between the different business along the railroad. Think that was because of their trucking background.
The WRS Management will spend a day or two relocating the rolling stock back to their correct location before the next regular ops session with the regular WRS Crew. Also a few minor issues came to light that will have to be addressed in the future.
I think at the next Board of Directors meeting, there will be a request for more flat cars.
Doug
Sunday, March 18, 2012
Monday, February 20, 2012
Ops Session Feb 19
The first operating session of the year finally happened. As a bonus we had one new Engineer operate on the WRS and had another one return after a long period of time.
The day start with assignment of the jobs on the WRS. Barry head for his usual job at the North Yard .
The day start with assignment of the jobs on the WRS. Barry head for his usual job at the North Yard .
Barry busy in the North Yard
With the usual Mainline Train Engineer Wayne unable to work today, Dave stepped up and operated the five Mainline Trains and was also seen operating a RDC to provide passenger service to the people along the WRS.
Dave passing thru the Paper Mill with one of his Mainline Trains as Gary (with clipboard) looks on.
Pierre and returning engineer Gary was busy all day dealing with the switching duties at the Paper Mill.
Gary and Pierre working the Mill Switcher.
Glen was the Engineer on the Dogwood Switcher for the day. And First time Engineer Ric, visiting from the Valley, was working the Roseton Switcher.
Ric in foreground and Glen busy in the background.
Because Ric would only stay for an hour, the second half of the Roseton Job was done by Dave and Barry. This is the first time Roseton has been switched in three or four sessions, much to the joy of local industries. The people in Bartown and Riverside are hoping that some day one of the trains that thunder by, will stop and switch their industries.
The session was great but had it usual little issues. The tracks need to cleaned more, think most of it was from the "dirt" on the rolling stock .... need to run trains more often. The locos need so maintance, since they have been setting around ... again need to run more trains. This session a few of the Crew changed their jobs, which has pointed out a few issues with the paper work that needs to updated or adjusted. Management has long list of items to address before the next session, maybe next month.
The main thing we all had a great time. It was nice to see Gary return and for Ric to finally be able to operate on the WRS.
Until next time
Doug
Sunday, January 8, 2012
Year in Review
It was a quiet year for the WRS with only three operating session for the regular crew and another session for a visiting crew, but a few new engineers did get to work on the WRS this year.
With the work on the On30 modules, which requires setting the modules up in the middle of the WRS, and the schedule of shows last year, did not leave too many weekends free for operating sessions.
The Railroad did see a few changes this year. The major one being the swapping of the function of the North and South (MEC) Yards, because of issues with the Classification Yard in the South Yard . The North Yard, which now is the "working" yard, had three new tracks added to complete a five track Classification Yard. The South (MEC) Yard trackage was reworked to be a "Staging Yard", five double ended tracks, a run around track, caboose track and engine terminal.
The change in the Yards also required a few adjustments in the Schedule of the Trains. There are a few more adjustments that maybe required as we have more operating sessions.
That is all for now
Doug
With the work on the On30 modules, which requires setting the modules up in the middle of the WRS, and the schedule of shows last year, did not leave too many weekends free for operating sessions.
The Railroad did see a few changes this year. The major one being the swapping of the function of the North and South (MEC) Yards, because of issues with the Classification Yard in the South Yard . The North Yard, which now is the "working" yard, had three new tracks added to complete a five track Classification Yard. The South (MEC) Yard trackage was reworked to be a "Staging Yard", five double ended tracks, a run around track, caboose track and engine terminal.
The change in the Yards also required a few adjustments in the Schedule of the Trains. There are a few more adjustments that maybe required as we have more operating sessions.
That is all for now
Doug
Monday, November 21, 2011
Something Strange Happened
Yes something strange happened yesterday on the WRS, there was an operating session. Yes it has been almost five months since the last one.
The regular Crew was joined by a new member Gord, who worked with Pierre switching Dogwood and Greenfield.
Pierre and Gord checking their orders at Dogwood
The Paper Mill Job was handled by Glen
Barry was busy at the North Yard Job
Wayne taken a break from running one of the five Main Line Trains, as he waits to enter the North Yard.
I ran my usual train, the MEC Transfer.
Roseton and Bartown were not switched due to a couple of the Crew not being able to attend.
Operations when smoothly, even with the long layoff. There are a couple issues to be addressed before the next session from the long layoff, management forgot to deal with them due the layoff.
Hopefully the next session will not take five months to happen.
Doug
Tuesday, September 13, 2011
Update Sept 13th
Yes it has been a long time since my last posting, but there has not been anything to report on the WRS side.
Did rebuild part of the North Yard to deal with the issues from the last operating session. This did help some of the issues, but there is still a few more to address. Having trouble pushing two Genesis box cars thru the switches, added more weight to the cars, which help but there is still issues. One time it works and the next time it does not, need to test more cars in the yard.
I have not been spending time on the layout this summer, in the summer it is On30 construction time, which has been taking most of my model railroading time. But this summer I did get a chance to ride the trains in Windsor on Trecothic Creek Railway. It was a birthday party for one of the WRS engineers.
With a number of things to complete on the On30 side before the Truro Show in October, will likely not getting back to the WRS until after the Truro Show.
thanks
Doug
Did rebuild part of the North Yard to deal with the issues from the last operating session. This did help some of the issues, but there is still a few more to address. Having trouble pushing two Genesis box cars thru the switches, added more weight to the cars, which help but there is still issues. One time it works and the next time it does not, need to test more cars in the yard.
I have not been spending time on the layout this summer, in the summer it is On30 construction time, which has been taking most of my model railroading time. But this summer I did get a chance to ride the trains in Windsor on Trecothic Creek Railway. It was a birthday party for one of the WRS engineers.
With a number of things to complete on the On30 side before the Truro Show in October, will likely not getting back to the WRS until after the Truro Show.
thanks
Doug
Monday, June 27, 2011
Ops Session June 26
Yes after too long period of time, the WRS finally was on the move again. Looking back in the records, this was the first operating session for the regular crew since mid January. Yes there was a special session at the end of March for visiting operators.
The Crew had a chance to see the changes to the Railroad, before the locos came to live. Barry headed to the North Yard and began preparing the south bound trains. Wayne picked up the pair of leased BN C424 and headed with 101S for points south. Pierre headed for the South Yard and picked up the Dogwood Turn, which now departs form the South Yard. And Glen headed for the Mill to do its required switching. Roseton crew did not report to duty today. And I got to run the MEC Transfer.
Operations when well for being shut down this long. The Maintenance Department does have a list of issues to address before the next session. Too much rust in places.
Glen looking over the Orders for White River Paper Co.
Pierre working Dogwood and over seeing Wayne dropping cars from one of Main Line Trains
Barry busy in the North Yard
Wayne getting ready to depart the South Yard with another run.
Management also will have to work on some new paperwork to deal with operations in the North and South Yards. Also a few of the trains may have to be rebalanced.
But the main thing everyone had fun and enjoyed the session. They hope the next one will not be in six months time.
later
Doug
The Crew had a chance to see the changes to the Railroad, before the locos came to live. Barry headed to the North Yard and began preparing the south bound trains. Wayne picked up the pair of leased BN C424 and headed with 101S for points south. Pierre headed for the South Yard and picked up the Dogwood Turn, which now departs form the South Yard. And Glen headed for the Mill to do its required switching. Roseton crew did not report to duty today. And I got to run the MEC Transfer.
Operations when well for being shut down this long. The Maintenance Department does have a list of issues to address before the next session. Too much rust in places.
Glen looking over the Orders for White River Paper Co.
Pierre working Dogwood and over seeing Wayne dropping cars from one of Main Line Trains
Barry busy in the North Yard
Wayne getting ready to depart the South Yard with another run.
Management also will have to work on some new paperwork to deal with operations in the North and South Yards. Also a few of the trains may have to be rebalanced.
But the main thing everyone had fun and enjoyed the session. They hope the next one will not be in six months time.
later
Doug
Sunday, June 12, 2011
June Update
May has came and gone and the WRS did not operate. But did get a few projects completed.
Below are a few pictures of the new South / MEC Yard and the revised North Yard.
Note click on the pictures to enlarge.
Note click on the pictures to enlarge.
This is a view from the center of the Yard looking North. On the top left is the new engine service area , waiting for the leased MEC units to arrive and a couple WRS locos.
This the center of the Yard. There are four Arrival / Departure tracks (left side) and two round around tracks and caboose storage in the middle of them (right side)
This is a view of the revised North Yard. Three more tracks have been added to the Yard. The Classification Yard will now be five tracks, an Arrival Track, Run Around Track and two Departure Tracks
The fascia still needs to be installed in the North Yard as seen in the above picture.
There is still more work to do. With the changing of Yards, new paper work will be required and trains will have to be re-balanced. And then the cleaning begins.
I am hoping to be operating on the WRS by the end of month if no major issues arises.
later
Doug
Subscribe to:
Posts (Atom)