During the weekend many of the WRS operators came by to the visit the layout at the Show and view the handy work of David and Wayne with their new modules.
The layout provided a few interesting switching issues with three industries facing in one direction and the fourth in the other. A second switcher was put into services, since there was no run around track. At times both switchers were required to move a car from one industry to another, if a run around move was required. To improve the operation a RDC was added to the mix.
I did get to doing a little switching on the layout during the weekend.
The RDC on my module.
Shot down the length of modules. Wayne at the controls.
My fellow operators, Wayne, David, Ric and Zack discussing something.
Later
Doug
3 comments:
Yes it indeed was a success.We couldnt have done it with out you Doug.Thanks again.
Wayne
Nice to have you back in the fold (more or less). But other than for set up and tear down you've never really been far away.
It looks like everyone had a great time! Did you see the photos Wayne posted on the UMG Blog
TheUMG.wordpress.com
Wayne,it was my pleasure.
Yes, I did see Wayne's pictures. Waiting on Ric's and David's. I think we spend more time on Sunday taking pictures, then operating :-)
Doug
Post a Comment