The Southern Sub is the new lower level. With the Main Yard and the Paper Mill. This level will be around 44" as zero. There will a track that is 64 feet long around the wall, which will take you from the Southern Sub to the Northern Sub.
click to enlarge
later
Doug
Tuesday, December 16, 2008
Subscribe to:
Post Comments (Atom)
2 comments:
Hey Doug;
You got my intrest up after our discussion today , so figured I had better check out the plan - looks really good - I like the idea of a upper level duck under - at that height, should be easy enough for everyone to get under. Cheers and Happy Holidays.
Wayne
Thanks Wayne
There has been a few changes in the track plans. The South Yard is being redesigned after discussions at David's and I have added a connection on the Upper level (between the North yard and Northern Interchange) to provide a loop to break in locos and rolling stock.
Best of the Season to all
Doug
Post a Comment